The problems caused by the lack of project compatibility in the executive process of a metallic structure

Authors

DOI:

https://doi.org/10.33448/rsd-v11i8.31130

Keywords:

Projects; Compatibility; Metal structure; BIM.

Abstract

Compatibility aims to unify projects in a work, facilitating execution, mitigating structural changes that occur during construction, reducing maintenance costs and constructive difficulties that may appear in progress, in addition to maintaining final customer satisfaction. When analyzing the failures caused by the lack of compatibility, ways are imagined to reverse the problems obtained when the work is in progress, however, when dealing with a metallic structure, there are more adversities in the process - since these do not allow many adaptations in its primary structure (columns and beams) as a result of its dimensioning being all planned with its locations and load capacities already predetermined, making it difficult, but not impossible, any type of alteration in the execution. Thus, this research aims to analyze the problems caused in executive processes of metallic structures when their projects are not compatible, characterized and exemplified with cases found in buildings. The methodology is qualitative, an analysis through a case study made with a single metallic building. Among the results, problems were identified due to changes in the architecture and details requested by the owner when the assembly process was already in progress, in addition to the lack of compatibility between the projects that caused rework, time and additional resources to the construction. Concluding, therefore, that the execution process should only be started when the projects are defined, with all the compatibilizations between them duly carried out.

Author Biography

Mariana Gonçalves da Paixão , Centro Universitário Santo Agostinho

Engenheira Civil pelo Centro Universitário Santo Agostinho.

References

Agência Brasileira de Desenvolvimento Industrial, ABDI-MDIC (2018). A Implantação de Processos BIM: Coletânea Guias BIM ABDI-MDIC. Brasília, b. p. 31.

Almeida, M. R. B. (2015). Análise da interoperabilidade aplicada ao projeto BIM de Estruturas Metálicas. Dissertação de Mestrado em Engenharia Mecânica, Instituto Superior de Engenharia do Porto, Porto, Portugal. Recuperado em português 15, julho, 2021, de https://core.ac.uk/download/pdf/47142024.pdf.

Azhar, S., Carlton, W. A., Olsen, D., Ahmad, I. (2011). Building Information Modeling for sustainable design and LEED rating analysis. Automation in Construction. 20, 217–24.

Barros, M. M. S. B. (1998). O desafio da implantação de inovações tecnológicas no sistema produtivo das empresas construtoras. In: Seminário Tecnologia e Gestão na Produção de Edifícios: Vedações Verticais, São Paulo. Anais... São Paulo: EPUSP, p. 249-285.

Callegari, S. (2007) Análise da compatibilização de projetos em três edifícios residenciais multifamiliares. Dissertação de Pós-Graduação em Arquitetura e Urbanismo, UFSC, Florianópolis, Brasil. https://repositorio.ufsc.br/bitstream/handle/123456789/89863/248377.pdf?sequence=1&isAllowed=y.

Chen, F. & Liu, Y. (2015). Innovation Performance Study on the Construction Safety of Urban Subway Engineering Based on Bayesian Network: A Case Study of BIM Innovation Project. Journal Of Applied Science And Engineering. 18(3), 223-44.

Cheung, W. F., Lin, T. H., and Lin, Y. C. 2018. A Real-Time Construction Safety Monitoring System for Hazardous Gas Integrating Wireless Sensor Network and Building Information Modeling Technologies. Sensors 18 (2) (February 2): 436. doi:10.3390/s18020436. http://dx.doi.org/10.3390/s18020436.

Coral, J. G. L. (2013). Compatibilização de projetos: estudo de caso de um edifício residencial multifamiliar em alvenaria estrutural. Trabalho de Conclusão de Curso de Graduação em Engenharia Civil, UTFPR, Campo Mourão, Brasil. https:/qrepositorio.utfpr.edu.br/jspui/handle/1/6179.

Fabricio, M. M. (2002). Projeto simultâneo na construção de edifícios. Tese de Doutorado, Escola Politécnica, Universidade de São Paulo, São Paulo, Brasil. https://www.researchgate.net/profile/Marcio-Fabricio/publication/264825683_Projeto_Simultaneo_na_Construcao_de_Edificios/links/5578445808aeacff20027ea5/Projeto-Simultaneo-na-Construcao-de-Edificios.pdf.

Gil, A. C. (2008). Método e técnicas de pesquisa social (6. ed.). São Paulo, SP: Atlas S.A.

Godoy, A. S. (1995). Introdução à pesquisa qualitativa e suas possibilidades. Revista de Administração de Empresas, 35 (2), 67 –69.

Graziano, F. P. (2003). Compatibilização de projetos. Dissertação de Mestrado, Instituto de Pesquisas tecnológico, São Paulo, SP, Brasil.

Linderoth, H. C. J (2010). Understanding Adoption And use of BIM as the creation factor networks. Automation in Construction, 19, 66 –72.

Liu, Z., Lu, Y., Peh, L. C. (2019). A Review and Scientometric Analysis of Global Building Information Modeling (BIM) Research in the Architecture, Engineering and Construction (AEC) Industry. Buildings, 9. 210. 10.3390/buildings9100210.

Mehran, D. (2016). Exploring the Adoption of BIM in the UAE construction industry for AEC firms. Procedia Engineering, 145, 1110 –1118.

Melhado, S. B. (2005). Coordenação de projeto de edificações. São Paulo, SP: O Nome da Rosa.

Mikaldo, J. J. & Scheer, S. (2008). Compatibilização ou Engenharia Simultânea: Qual a melhor solução. Gestão & Tecnologia De Projetos, 3 (1), 79 –99.

Pinho, F. O. & Penna, F. (2008). Viabilidade econômica. Instituto Brasileiro de Siderurgia, Centro Brasileiro de Construção em Aço (Série Manual de Construção em Aço).

Reck, R. H. (2013). Proposta de método para integração da simulação de eventos discretos e visualização BIM 4D no projeto do sistema de produção. Tese de Mestrado em engenharia civil do Programa de Pós-Graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre, Brasil. http://hdl.handle.net/10183/127908.

Rodrigues, F. C. (2003). Tabelas de dimensionamento estrutural para edificações com o sistema construtivo em steel framing. Universidade Federal de Minas Gerais, Belo Horizonte, Brasil. em https://docplayer.com.br/2817851-Tabelas-de-dimensionamento-estrutural-para-edificacoes-com-o-sistema-construtivo-em-steel-framing.html.

Sales, U. C., Souza, H. A. e Neves, F. A. (2001). Interfaces entre Sistemas de Vedação e Estruturas Metálicas, Problemas Reais. Revista Téchne, São Paulo, 53, 98 –102.

Teixeira, R. B. (2007). Análise da Gestão de Processo de Projeto Estrutural de Construções Metálicas. Dissertação de Pós-Graduação em Engenharia de Estruturas, Universidade Federal de Minas Gerais – Escola de Engenharia, Belo Horizonte, Brasil. http://pos.dees.ufmg.br/defesas/234M.PDF.

Wong, J., Kwok W., Zhou, J. (2015). Enhancing Environmental Sustainability over building lifecycles through green BIM: A review. Automation in Construction, 57, 156 –165.

Published

26/06/2022

How to Cite

LIMA, J. S. .; PAIXÃO , M. G. da .; FERREIRA, D. S. . The problems caused by the lack of project compatibility in the executive process of a metallic structure. Research, Society and Development, [S. l.], v. 11, n. 8, p. e46711831130, 2022. DOI: 10.33448/rsd-v11i8.31130. Disponível em: https://rsdjournal.org/index.php/rsd/article/view/31130. Acesso em: 24 apr. 2024.

Issue

Section

Engineerings