Business Management: Design Science Research and Business Process Management integrated for a civil construction company

Authors

DOI:

https://doi.org/10.33448/rsd-v11i16.38586

Keywords:

Design Science Research; Process management; Construction; BPM.

Abstract

This study aims to propose an integrated process management methodology in a civil construction company, in a qualitative exploratory case study. First, a Brainstorming was carried out, with meetings and interviews with managers from different hierarchical levels. Inefficiencies were reported in the execution of the organization's activities, resulting in waste and delays in the works, which was affecting the company's competitiveness and the quality of the services provided. Based on this local issue, we sought to apply Design Science Research (DSR) integrated to Business Process Management (BPM), for better understanding, diagramming and understanding of the flow of processes. After implementing the integrated methodology, there were improvements related to the speed of decision making, reduction of costs with rework or waste, increase in quality via standardization of activities, which will result in greater satisfaction for the construction company's customers.

References

Association of Business Process Management Professionals (ABPMP). (2013). Guia para o Gerenciamento de Processos de Negócio - Corpo Comum de Conhecimento. Versão 3.0. BPM CBOK.

Capote, G. (2011). Guia para Formação de Analistas de Processos. v.1, Ministério da Saúde. https://www.saude.go.gov.br/images/imagens_migradas/uploads/2017/08/livro-guia-para-formacao-de-analistas-de-processos.pdf

Chervinski, J. O. M., Tolfo, C., & Milani, A. S. (2019). Modelagem de processo aplicada à melhoria da gestão em um Escritório Modelo de Engenharia Civil. Research, Society and Development, 8(12), e178121711. https://doi.org/10.33448/rsd-v8i12.1711

Damasceno, R. A. (2021). Melhoria da eficiência de compras públicas na Universidade Federal do Cariri: plano de ação para implementação de estratégias mediante o caminho metodológico do Design Science Research (Master's thesis, Universidade Federal do Rio Grande do Norte).

Davenport, T. (1994). Reengenharia de Processos. (ed. 5.).

Dresch, A., Lacerda, D. P., & Júnior, J. A. V. A. (2015). Design science research: método de pesquisa para avanço da ciência e tecnologia. Bookman Editora.

Francisco, R., & Garcia, A. (2017). Gestão de Processos: Alinhamento Estratégico entre TI e Negócio com BPMN. Tecnologia em Sistemas para Internet. Instituto Federal Goiano – Campus Morrinhos.

Freitas Junior, J., Machado, L., Klein, A., & Freita, A. (2015). Design Research: Aplicações Práticas e Lições Aprendidas. Revista de Administração FACES Journal. 14(1), 95-116.

Gerhardt, T. E., & Silveira, D. T. (2009). Métodos de pesquisa. Plageder.

Gil, A. C. (2002). Como elaborar projetos de pesquisa. Atlas.

Hevner, A., March, S., Park, J., & Ram, S. (2004). Design Science in Information Systems Research. MIS Quarterly. 20(1), 75–105.

IBGE - Instituto Brasileiro de Geografia e Estatística. (2022). Pesquisa anual da indústria da construção. https://www.ibge.gov.br/estatisticas/economicas/industria/9018-pesquisa-anual-da-industria-da-construcao.html?=&t=destaques.

Lacerda, D. P., Dresch, A., Proença, A., & Antunes Júnior, J. A. V. (2013). Design Science Research: método de pesquisa para a engenharia de produção. Gestão & produção, 20, 741-761.

Manson, N. J. (2006). Is operations research really research?. Operations Research Society of South Africa, 22(2), 155–180.

March, S. T., & Smith, G. F. (1995). Design and natural science research in Information Technology. Decision Suport Systems, 15,251-266.

Mertens, W., Van Den Bergh, J., Viaene, S., & Schroder, F. (2011). How BPM Impacts Jobs: An Exploratory Field Study. 44 th Hawaii International Conference on System Sciences. IEEE, United States of America, 1–10.

Moraes Junior, N. (2014). Melhoria do Processo de Gestão da Construção Civil com o Uso da Disciplina BPMN. Pontifícia Universidade Católica de Goiás. Programa de Pós-Graduação em Engenharia de Produção e Sistemas. Curso de Mestrado, Goiânia.

Mourão, G. G. D. O. (2017). Gestão de Processos de Negócio: um estudo de caso BPM em processos de exportação. Universidade Federal Fluminense. Instituto de Ciência e Tecnologia. Rio das Ostras.

Oliveira Bernardo, G., Santos, J. R. T., & Miranda, C. G. M. (2019). Aplicação da dinâmica de sistemas na gestão de processos de construção civil – utilização do software vensim. Braz. J. of Develop., Curitiba, 5(7), 7886-7902.

OMG. Object Management Group. (2011). Business Process Model and Notation (BPMN) Version 2.0. https://www.omg.org/spec/BPMN/2.0/PDF.

PIB da construção fecha o ano com crescimento de 9,7%, a maior alta em 11 anos. (2022). Câmara Brasileira da Indústria da Construção. Agência CBIC. https://cbic.org.br/wp-content/uploads/2022/03/informativo-economico-pib-04-marco-2022.pdf

Rebelo, V. D. L. V., de Souza Menezes, G. M., Nelo, V. A. W., dos Santos Freitas, J. M., & Marinho, D. F. S. (2020). Mapeamento de processos com base na metodologia BPMN: um estudo de caso em uma companhia de gás. Caderno de Graduação-Ciências Exatas e Tecnológicas-UNIT-ALAGOAS, 6(2), 19-30. https://periodicos.set.edu.br/fitsexatas/article/view/8523/4269.

Reis, C. J. L., Seixas, R. D. M., Silva, G. D., Maués, L. M. F., & Duarte, A. A. A. M. (2016). Identificação das causas de atrasos de obras: um estudo de caso na região metropolitana de Belém. Encontro Nacional de Tecnologia do Ambiente Construido,16.

Revista Exame. Imóveis – Um mercado sob suspeita. (3), 32.

Ribeiro, T. D. O., Drumond, G. M., Méxas, M. P., & Costa, H. G. (2015). Benefícios do BPMN na Modelagem dos Processos: Um Estudo Exploratório. In Simpósio de Engenharia de Produção.

Santos, L. D. L., da Silva Florêncio, M. N., Escobar, M. A. R., & Zambanini, M. E. (2018). A importância dos manuais na gestão dos processos de trabalho com base na percepção da gerência: um estudo de caso aplicado nos correios do interior sergipano. In 9th International Symposium on Technological Innovation.

Santos, D. F., Schramm, F., & Schramm, V. B. (2019). Análise da maturidade em gestão de projetos de uma empresa da construção civil utilizando a metodologia MMGP. Interfaces Científicas-Exatas e Tecnológicas, 3(3), 49-64.

Takeda, H., Veerkamp, P., & Yoshikawa, H. (1990). Modeling design process. AI magazine, 11(4), 37-37.

Teixeira Netto, J., Santos, J. A. N. D., Passos Filho, W., & Oliveira, N. L. F. D. (2020). Proposta de melhorias na gestão de empresas de construção civil: um estudo de caso internacional. Interações (Campo Grande), 21, 499-512.

Vaishnavi, V., & Kuechler, W. (2004). Design research in information systems.

Venable, J. (2006). The role of theory and theorising in design science research. In Proceedings of the 1st International Conference on Design Science in Information Systems and Technology, DESRIST,1-18.

Vogel, A. D. R. (2019). Planejamento e gestão de processos na construção civil.

Published

16/12/2022

How to Cite

ARAUJO, B. C.; LOPES, H. dos S. Business Management: Design Science Research and Business Process Management integrated for a civil construction company. Research, Society and Development, [S. l.], v. 11, n. 16, p. e517111638586, 2022. DOI: 10.33448/rsd-v11i16.38586. Disponível em: https://rsdjournal.org/index.php/rsd/article/view/38586. Acesso em: 30 dec. 2024.

Issue

Section

Engineerings