Overall Equipment Effectiveness; Key Performance Indicator; Rock Drilling; Geology.Abstract
OEE (Overall Equipment Effectiveness) is a key performance indicator (KPI) widely used in performance analysis in the mining industry. The present study develops the ODE indicator (Overall Drilling Effectiveness) adapting OEE concept for the reality of diamond drilling. The product of availability, utilization and quality rates in the drilling process calculates ODE. Quality is defined by the quotient between recovered drill core metreage and total drilling advance metreage. ODE consists of a management numeric tool when confronted with productivity results and drilling equipment cost. In this case study of Pilar Mine, property of Jaguar Mining Inc., the 21% rate portrays the minimum acceptable ODE value considering the enterprise operational reality according to its geological, logistical and financial particularities. When the ODE rate approaches or exceeds this value, productivity increase and cost reduction per drilled metreage are noted. The adaptation of OEE concept and elaboration of ODE as a new performance indicator, intended directly for diamond drilling process, displays as a useful performance control tool. The utilization of ODE as a KPI provides the opportunity to manage operational productivity and financial performance simultaneously.
References
Batista, S. P., Souza, F. R., & Lima, H. M. de (2022). Evolução dos indicadores de desempenho na mineração. Research, Society and Development, 11(17), e225111739273. https://doi.org/10.33448/rsd-v11i17.39273
Brasil, A., & Candia R. C. (2020). Análise de Indicadores De Produção em Uma Mina Subterrânea. Anais do X Conbrepro, Congresso Brasileiro. De Engenharia de Produção. Evento Online.
Caldeira, J. (2012). 100 Indicadores da Gestão: Key Performance Indicators. Ed. Coimbra.
Carter-Journet, K.., Kale, A.., Falgout, T.., and L. Heuermann-Kuehn. (2014) Drilling Optimization: Utilizing Lifetime Prediction to Improve Drilling Performance and Reduce Downtime. SPE Deepwater Drilling and Completions Conference, Galveston, Texas, USA. Doi: https://doi.org/10.2118/170270-MS
Corrales, L. D. C., Lambán, M. P., Hernandez Korner, M. E., & Royo, J. (2020). Overall Equipment Effectiveness: Systematic Literature Review and Overview of Different Approaches. Appl. Sci. 10, 6469.
Corrales, L. D. C., Lambán, M. P., Morella, P., Royo, J., Sánchez Catalán, J. C., & Hernandez Korner, M. E. (2022). Developing and Implementing a Lean Performance Indicator: Overall Process Effectiveness to Measure the Effectiveness in an Operation Process. Machines. 10, 133.
Costa, F. V. (2015). Análise dos principais indicadores de desempenho usados no planejamento de lavra. Universidade Federal de Ouro Preto.
Dal, B., Tugwell, P., & Greatbanks, R. (2000). Overall equipment effectiveness as a measure of operational improvement – A practical analysis. Int. J. of Op. & Prod. Man. 20(12), 1488-1502.
Dauber C., & Bendrat N. (2014). Key performance indicators - A tool to assess ICT applications in underground coalmines. J. South. Afr. Inst. Min. Metall. 114, 1017–1022.
Elevli, S., & Elevli, B. (2010). Performance Measurement of Mining Equipments by Utilizing OEE. Acta Mont. Slov. 15(2), 95-101.
Fourie, H. (2016). Improvement in the overall efficiency of mining equipment: A case study. J. South. Afr. Inst.Min. Metall. 116, 275–281.
Gackowiec P., Podobinska-Staniec M., Brzychczy E., Kühlbach C., & Özver T. (2020). Review of Key Performance Indicators for Process Monitoring in the Mining Industry. Energies, 13, 5169. 10.3390/en13195169.
Heberle, J. M. (2020). Desenvolvimento de metodologia para consolidação de indicadores de desempenho para controle e gestão na mineração: Um estudo de caso. Curso de Pós-Graduação em Engenharia de Minas, Metalúrgica e de Materiais, Universidade Federal do Rio Grande do Sul.
Helleno A. L., Moraes A. J. I., & Simon A. T. (2017). Integrating sustainability indicators and Lean Manufacturing to assess manufacturing processes: Application case studies in Brazilian industry. Journal of Cleaner Production. 153(405-416). Doi: 10.1016/j.jclepro.2016.12.072.
Lamjahdi A., Bouloiz H., & Gallab M. (2021). Overall performance indicators for sustainability assessment and management in mining industry. 7th International Conference on Optimization and Applications (ICOA). Wolfenbüttel, Alemanha. doi:10.1109/ICOA51614.2021.9442635.
Nader, B., Tomi, G. de, & Passos, A. O. (2012). Indicadores-chave de desempenho e a gestão integrada da mineração. Rem: Revista Escola De Minas, 65(4). https://doi.org/10.1590/S0370-44672012000400015
Nakajima, S. (1988) Introduction to TMP. Productivity Press. Cambridge. USA.
Parmenter, D. (2015) Key Performance Indicators - Developing, Implementing, and Using Winning KPIs. 3rd Edition, Wiley, Hoboken. https://doi.org/10.1002/9781119019855
Pintelon, L., & Muchiri, P. N. (2008). Performance measurement using overall equipment effectiveness (OEE): Literature review and practical application discussion. Int. J. of Prod. Res. Taylor & Francis. 46(13), 3517-3535.
Ribeiro, E. M. A. (2022). Utilização de KPI na avaliação do impacto da formação em acidentes de trabalho na indústria extrativa e transformadora. Dissertação de Mestrado em Engenharia de Segurança e Higiene Ocupacionais. Faculdade de Engenharia da Universidade de Porto.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 William Medina Leite Féres; Bárbara Santana Estanislau Neto
This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
1) Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2) Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3) Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.